ASV Energy Solutions has installed more than 90 MW of solar across rooftop and ground mount projects. These are the larger commercial, industrial and utility-scale plants, with the equipment used and the results for each site.
- 90 MW+Total capacity across rooftop and ground mount projects
- 5,500+Active installations for homes, businesses and industry
- 3 statesGujarat, Maharashtra and Madhya Pradesh
Commercial and Industrial Rooftop Solar Projects
Eleven rooftop plants from 50 kWp to 1,700 kWp, for factories, hospitals, colleges and a housing society. See our commercial and industrial solar service for how these projects are designed and delivered.
Industrial
Ornet Transformers Pvt Ltd
Borisana, Kadi-Kalol, Gujarat
1,700 kWp Across three factory units
- Industry
- Transformer manufacturing
- Panels
- Raajratna TOPCon 615 Wp
- Inverter
- Sungrow
- Cables
- Polycab
- Structure
- Anodised aluminium mounting
- ₹60,00,000 → ₹32,00,000Monthly bill, before → after
- ₹3 crore+Estimated annual savings
- 2.5 yearsPayback period

Industrial
Chamunda Plastic Pvt Ltd
Anara, Kheda, Gujarat
1,250 kWp
- Industry
- Plastic manufacturing
- Panels
- Waaree TOPCon 615 Wp
- Inverter
- Sungrow
- Cables
- Polycab
- Commissioned
- April 2026
- ₹33,12,500 → ₹16,87,500Monthly bill, before → after
- ₹2,02,50,000Estimated annual savings
- 20,25,000 kWhUnits generated per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹50.63 crore
“Commitment and workmanship of team ASV is the USP for dealing with them.”Chamunda Plastic Pvt Ltd

Industrial
Sahara Granito
Gambhoi, Himmatnagar, Gujarat
400 kWp
- Industry
- Granite manufacturing
- Panels
- Raajratna Mono
- Inverter
- Solaryaan
- Structure
- Aluminium bracket
- Commissioned
- 2024
- ₹8,00,000 → ₹4,00,000Monthly bill, before → after
- ₹48,00,000Annual savings
- 5,80,000 kWhUnits generated per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹12 crore

Industrial
Partabi Industries
Kerala GIDC, Bavla, Ahmedabad
250 kWp
- Industry
- Plastic
- Panels
- Raajratna Monofacial
- Inverter
- Solaryaan
- Structure
- MS pipe on terrace, aluminium bracket on curved shed
- Commissioned
- 2024
- ₹30,00,000Annual savings
- 3,65,000 kWhUnits generated per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹7.5 crore

Commercial
Indamed Pharmaceuticals
Mansa, Gandhinagar
150 kWp
- Industry
- Pharmaceutical
- Panels
- Waaree Bifacial
- Inverter
- Solaryaan
- Structure
- GI structure
- Commissioned
- 2024
- ₹3,00,000 → ₹1,50,000Monthly bill, before → after
- ₹18,00,000Annual savings
- 2,70,000 kWhUnits generated per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹4.5 crore

Institutional
St. Xavier's College
Navrangpura, Ahmedabad
100 kWp
- Sector
- College
- Panels
- Raajratna Mono Bifacial
- Inverter
- Solaryaan
- Structure
- MS pipe, heightened with walkway
- Commissioned
- 2024
- ₹2,50,000 → ₹1,50,000Monthly bill, before → after
- ₹12,00,000Annual savings
- 1,64,250 kWhUnits generated per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹3 crore

Industrial
Vijay & Kishor Engineering
Vatva GIDC, Ahmedabad
100 kWp
- Industry
- Engineering
- Panels
- Waaree Bifacial
- Inverter
- Solis
- Structure
- Heavy MS pipe (72×72×3 and 80×40×3 mm)
- Commissioned
- 2024
- ₹1,20,000 → ₹30,000Monthly bill, before → after
- ₹12,00,000Annual savings
- 1,64,250 kWhUnits generated per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹3 crore

Commercial
VIMS Hospital
Motera, Ahmedabad
100 kWp
- Sector
- Hospital
- Panels
- Waaree Bifacial
- Inverter
- Goodwe
- Structure
- Heightened GI structure (80×40 mm)
- Commissioned
- 2025
- ₹5,00,000 → ₹4,00,000Monthly bill, before → after
- ₹12,00,000Annual savings
- 1,65,000 kWhUnits generated per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹3 crore

Housing society
Sparsh 32 Society
Kudasan, Gandhinagar
80 kWp 25 flats, 3.27 kW per flat on average
- Sector
- Residential society
- Panels
- Adani Mono Bifacial
- Inverter
- Sofar
- Structure
- MS pipe, heightened with walkway
- Commissioned
- 2025
- ₹6,000 → ₹0Bill per flat, before → after
- ₹36,000Annual savings per flat
- 5,370 kWhUnits per flat per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹9 lakh per flat
Subsidy of ₹78,000 per flat availed by all 25 members.

Institutional
AUDA Town Hall
Mahemdabad, Gujarat
70 kWp
- Sector
- Public building
- Panels
- Waaree Monofacial
- Inverter
- Solaryaan
- Structure
- Aluminium bracket
- Commissioned
- 2025
- ₹70,000 → ₹0Monthly bill, before → after
- ₹8,40,000Annual savings
- 1,02,200 kWhUnits generated per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹2.1 crore

Industrial
Gayatri Technoplast
Sector-25 GIDC, Gandhinagar
50 kWp
- Industry
- Chemical
- Panels
- Adani Bifacial
- Inverter
- Solaryaan
- Structure
- Aluminium bracket
- Commissioned
- 2025
- ₹1,50,000 → ₹1,00,000Monthly bill, before → after
- ₹6,00,000Annual savings
- 82,000 kWhUnits generated per year
- 2.5 yearsPayback period
Estimated savings over 25 years: ₹1.5 crore
Ground Mount Solar Projects
Nine utility-scale projects across three states, with a combined capacity of 77.75 MW. More on our ground mount solar service.


Featured project · Full EPC
6 MW Ground Mount Solar Plant, Kutch
A utility-scale plant on open land in Kutch, built by ASV from design and procurement to installation and grid connection.
- Capacity
- 6 MW
- Scope
- Full EPC
- Location
- Kutch, Gujarat
- Status
- Commissioned
700 kW Battery Energy Storage (BESS)
ASV is executing a 700 kW battery energy storage project, adding storage to its solar EPC work.
| Project | Location | Capacity |
|---|---|---|
| Raajratna Ventures Ltd. | 3 sites, Gujarat | 18 MW |
| Solar Ace | Sangli, Maharashtra | 13 MW |
| Ataru Renewable | Gujarat | 10 MW |
| Kolhapur | Maharashtra | 10 MW |
| Mau | Madhya Pradesh | 7 MW |
| Tharad | Gujarat | 6.75 MW |
| Kutch (full EPC) | Gujarat | 6 MW |
| Solarium Green Energy | Surendranagar, Gujarat | 4 MW |
| Sangli | Maharashtra | 3 MW |
| Combined ground mount capacity | 77.75 MW | |
Solar Projects by Area
Most of our rooftop work is in and around Ahmedabad and Gandhinagar, with larger industrial and ground mount plants further out.
Ahmedabad
- Vijay & Kishor Engineering, Vatva GIDC, 100 kWp
- Partabi Industries, Kerala GIDC, Bavla, 250 kWp
- VIMS Hospital, Motera, 100 kWp
- St. Xavier's College, Navrangpura, 100 kWp
Gandhinagar
- Sparsh 32 Society, Kudasan, 80 kWp across 25 flats
- Indamed Pharmaceuticals, Mansa, 150 kWp
- Gayatri Technoplast, Sector-25 GIDC, 50 kWp
North and central Gujarat
- Ornet Transformers, Kadi-Kalol, 1,700 kWp
- Chamunda Plastic, Kheda, 1,250 kWp
- Sahara Granito, Himmatnagar, 400 kWp
- AUDA Town Hall, Mahemdabad, 70 kWp
Ground mount sites
- Kutch, Gujarat, 6 MW (full EPC)
- Gujarat: Raajratna Ventures, Ataru Renewable, Tharad and Surendranagar
- Maharashtra: Solar Ace, Kolhapur and Sangli
- Mau, Madhya Pradesh, 7 MW
Planning a solar plant for your factory or site?