Solar EPC for Vadodara homes, societies and industry
Rooftop and Industrial Solar in Vadodara, Installed by ASV
Quick answer: ASV Energy Solutions installs rooftop solar for homes, housing societies and factories across Vadodara, from Gotri and Vasna-Bhayli to Makarpura, Por and Savli GIDC. A 3 kW home system costs about ₹1.50–1.71 lakh, or ₹72,000–93,000 after the PM Surya Ghar subsidy (indicative, November 2026). We handle MGVCL net metering end to end.
ASV Energy Solutions is a solar EPC company based in Koba, Gandhinagar, with 5,500+ installations and 90 MW+ of capacity built across Gujarat, Maharashtra and Madhya Pradesh. Vadodara is about two hours down the expressway, and we take on home, society and industrial projects across the city and its GIDC belt.
Electricity in Vadodara city and district is supplied by MGVCL (Madhya Gujarat Vij Company), which is headquartered here. Every net metering application, inspection and meter goes through your MGVCL sub-division, and we handle that paperwork for you.
- MGVCL net meteringApplications, inspection and meter handled by us
- Up to ₹78,000PM Surya Ghar subsidy, plus the state top-up up to 2.18 kW
- Makarpura, Por, SavliFactory rooftops across Vadodara's GIDC belt
Our work across Gujarat
Solar Plants We Have Built
Real plants and real bills from our projects in Gujarat. See all of them, including our 6 MW ground-mount plant in Kutch, on the projects page.

Industrial rooftop · 2024
Vijay & Kishor Engineering
Vatva GIDC, Ahmedabad · 100 kWp
- Monthly bill
- ₹1,20,000 → ₹30,000
- Annual savings
- ₹12,00,000
- Equipment
- Waaree bifacial, Solis

Industrial rooftop · 2024
Partabi Industries
Kerala GIDC, Bavla · 250 kWp
- Units per year
- 3,65,000 kWh
- Annual savings
- ₹30,00,000
- Equipment
- Raajratna, Solaryaan

Hospital rooftop · 2025
VIMS Hospital
Motera, Ahmedabad · 100 kWp
- Monthly bill
- ₹5,00,000 → ₹4,00,000
- Annual savings
- ₹12,00,000
- Equipment
- Waaree bifacial, Goodwe

Institutional rooftop · 2024
St. Xavier's College
Navrangpura, Ahmedabad · 100 kWp
- Monthly bill
- ₹2,50,000 → ₹1,50,000
- Annual savings
- ₹12,00,000
- Equipment
- Raajratna bifacial, Solaryaan
Prices
Solar Panel Price in Vadodara (November 2026)
Vadodara homes pay the same Gujarat prices and get the same subsidies as the rest of the state. What changes is your roof, structure height and the brands you choose.
| System size | Price before subsidy | Subsidy | You pay | Units per month |
|---|---|---|---|---|
| 1 kW | ₹55,000–62,000 | ₹30,000 + state top-up | ≈ ₹5,000 with state top-up* | ~120 |
| 2.18 kW | ₹1,13,000–1,26,000 | ₹63,240 + state top-up | ≈ ₹10,810 with state top-up* | ~260 |
| 3 kW | ₹1,50,000–1,71,000 | ₹78,000 | ₹72,000–93,000 | ~360 |
| 5 kW | ₹2,40,000–2,75,000 | ₹78,000 | ₹1,62,000–1,97,000 | ~600 |
| 10 kW | ₹4,60,000–5,30,000 | ₹78,000 | ₹3,82,000–4,52,000 | ~1,200 |
Indicative prices, November 2026, for on-grid systems with DCR panels, elevated structure, installation and net meter paperwork. *Gujarat's state top-up applies to home systems up to 2.18 kWp commissioned from 22 October 2026: you pay 10% of the benchmark (5% for SC/ST). Size guides: 2 kW with state subsidy, 3 kW price, 5 kW price. Full list: solar panel price in Gujarat.
Where we work
Areas We Serve in Vadodara
We work across Vadodara city, the GIDC estates around it and nearby towns in MGVCL's area.
Homes and bungalows
Alkapuri, Gotri, Vasna-Bhayli, Akota, Manjalpur, Karelibaug, Sama, New VIP Road, Harni and Waghodia Road.
Residential solarHousing societies
Common-area solar for lifts, pumps and lighting. Under PM Surya Ghar, group housing societies get ₹18,000 a kW for common facilities.
Society subsidy rulesGIDC factories
Makarpura, Por-Ramangamdi, Savli, Manjusar, Waghodia and Nandesari estates, for engineering, pharma and chemical units.
Industrial solarSchools, hospitals and offices
Daytime loads that match solar output well, often with quick paybacks on commercial tariffs.
Ask for a site visitFor factories
Factory Solar in Vadodara's GIDC Belt
Vadodara's industrial base, from engineering and fabrication in Makarpura to pharma and chemical units in Savli, Manjusar and Nandesari, runs mostly in daylight, which is exactly when solar produces. Many of these units have large shed roofs that sit empty.
Under GERC's 2026 net metering rules, a factory can set off exported units only up to 30% of the units it imports in each billing cycle. So we size your plant to what your unit uses during the day, not to your total monthly bill. For chemical and pharma units we also check roof loading, corrosive fumes near the roof and the fire-safety layout before we design.
| Plant size | Indicative cost (GST incl.) | Units a year | Typical fit |
|---|---|---|---|
| 50 kW | ₹21–25 lakh | ~75,000 | One-shift unit, 6,000–9,000 units a month in daytime |
| 100 kW | ₹40–48 lakh | ~1.5 lakh | Small HT or large LT unit |
| 500 kW | ₹1.9–2.3 crore | ~7.5 lakh | Two-shift plant with a big shed roof |
| 1 MW | ₹3.5–4.2 crore | ~15 lakh | Large HT consumer; check the 30% set-off cap |
Indicative, November 2026. Guides: 50 kW plant cost, 100 kW plant cost, 1 MW plant cost, sizing from your bill, battery storage for factories.
Approvals
Net Metering in Vadodara: How MGVCL Works
MGVCL follows the same GERC rules as every DISCOM in Gujarat. Homes get full set-off of exported units against imports, with surplus bought at ₹2.25 a unit. Factories and shops can set off exports up to 30% of their imports, with banking charges.
In practice, the timeline depends on your MGVCL sub-division's inspection queue. A complete file, with drawings, test reports and inverter certificates, keeps it moving.
- Site visit and sizingWe check your roof, last 12 bills and sanctioned load, and size the plant to what you use.
- ApplicationHomes apply on the PM Surya Ghar portal; factories and shops go through GEDA, the CEI and MGVCL. We file it all.
- InstallationOne to three days for a home; two to six weeks for a factory plant, depending on size.
- Inspection and net meterMGVCL inspects the plant and fits the net meter. A complete file is the best way to avoid delays.
- Subsidy and monitoringFor homes, the subsidy reaches your bank account after commissioning. We set up monitoring and service visits.
Full rules: net metering in Gujarat under the GERC 2026 regulations and our Gujarat solar subsidy guide.
Why ASV
Why Vadodara Customers Choose ASV
Full EPC under one roof
Design, supply, installation, approvals and service by our own team, not a chain of sub-contractors.
Factory and ground-mount experience
From 100 kWp factory rooftops to multi-MW ground-mount plants, so your industrial plant is designed properly.
Honest sizing
We size to your daytime use and the new GERC rules, and we'll tell you when a smaller plant pays better.
Approvals handled
PM Surya Ghar, GEDA, CEI and MGVCL paperwork filed and followed up by us.
Questions Vadodara customers ask
Solar in Vadodara: FAQs
How much does a 3 kW solar system cost in Vadodara?
About ₹1.50–1.71 lakh installed with DCR panels, or ₹72,000–93,000 after the ₹78,000 PM Surya Ghar subsidy (indicative, November 2026).
Is the Gujarat state solar subsidy available in Vadodara?
Yes. MGVCL consumers get the state top-up on PM Surya Ghar for home systems up to 2.18 kWp commissioned from 22 October 2026. You pay 10% of the benchmark cost (5% for SC/ST), about ₹10,810 for 2.18 kW.
Which DISCOM handles net metering in Vadodara?
MGVCL (Madhya Gujarat Vij Company) for Vadodara city and district. We file the application and follow up until the net meter is fitted.
Do you install solar for factories in Makarpura, Savli or Por GIDC?
Yes. We design and build industrial rooftop plants for GIDC units, sized to daytime use under GERC's 2026 rules, with GEDA, CEI and MGVCL approvals handled by us.
How long does solar installation take in Vadodara?
A home system takes one to three days on site. The MGVCL inspection and net meter usually follow within a few weeks, depending on the sub-division.
Can a housing society in Vadodara get a solar subsidy?
Yes. Under PM Surya Ghar, group housing societies get ₹18,000 a kW for common facilities such as lifts, pumps and lighting, and individual flats can claim the home subsidy on their own connections.
How much will solar save on an MGVCL bill?
A 3 kW plant makes about 360 units a month and saves roughly ₹2,490 a month on a 400-unit home bill at FY 2026-27 tariffs.
Do you visit Vadodara for site surveys?
Yes. Send us your bill and roof photos on WhatsApp first; we confirm feasibility and then schedule a site visit.
Contact
Get a Solar Quote in Vadodara
ASV Energy Solutions
609, Radhe Times Square, near Institute of Hotel Management, Koba, Gandhinagar 382426
Phone and WhatsApp: +91 96626 63069
Email: info@asvenergysolutions.com
We're based in Koba, Gandhinagar, and work across Vadodara and central Gujarat. Send your last electricity bill and a roof photo on WhatsApp for a quick estimate.
- Gujarat state top-up up to 2.18 kWp (Energetica India, Oct 2026)
- GERC DRES Regulations 2026 (SolarQuarter, 2 Nov 2026)
- PM Surya Ghar portal
About the author
Vishal Modi, Managing Partner, ASV Energy Solutions
Vishal leads ASV Energy Solutions, a solar EPC company based in Gandhinagar. The team has completed 5,500+ solar installations and 90 MW+ of capacity across homes, factories and ground-mount plants in Gujarat, Maharashtra and Madhya Pradesh, and handles PM Surya Ghar and net metering approvals with every Gujarat DISCOM.
Last updated: 8 November 2026