Solar EPC for Ahmedabad homes, societies and industry
Rooftop and Industrial Solar in Ahmedabad, Installed by ASV
Quick answer: ASV Energy Solutions installs rooftop solar for homes, housing societies, factories and hospitals across Ahmedabad, from Navrangpura and Motera to Vatva GIDC and Bavla. A 3 kW home system costs about ₹1.50–1.71 lakh, or ₹72,000–93,000 after the PM Surya Ghar subsidy (indicative, October 2026). We handle Torrent Power and UGVCL net metering.
ASV Energy Solutions is a solar EPC company based in Koba, on the Gandhinagar–Ahmedabad corridor. We design, supply, install and maintain solar plants for bungalows, housing societies, factories, hospitals and offices across Ahmedabad, from Motera and Chandkheda to the GIDC estates at Vatva and Bavla.
One team handles the whole job: a free site visit, plant design, the PM Surya Ghar subsidy application for homes, net metering approval with your DISCOM, installation, and service after commissioning.
- Vatva, Bavla, MoteraPlants we have built in Ahmedabad
- Up to ₹78,000PM Surya Ghar subsidy for a home system
- Torrent Power and UGVCLNet metering paperwork handled for both
Our work in Ahmedabad
Solar Projects We Have Delivered in Ahmedabad
Real plants, real bills. Each one was designed, installed and commissioned by the ASV team.


Industrial rooftop · 2024
Vijay & Kishor Engineering
Vatva GIDC, Ahmedabad · 100 kWp
- Monthly bill
- ₹1,20,000 → ₹30,000
- Annual savings
- ₹12,00,000
- Equipment
- Waaree bifacial, Solis


Industrial rooftop · 2024
Partabi Industries
Kerala GIDC, Bavla · 250 kWp
- Units per year
- 3,65,000 kWh
- Annual savings
- ₹30,00,000
- Equipment
- Raajratna, Solaryaan


Hospital rooftop · 2025
VIMS Hospital
Motera, Ahmedabad · 100 kWp
- Monthly bill
- ₹5,00,000 → ₹4,00,000
- Annual savings
- ₹12,00,000
- Equipment
- Waaree bifacial, Goodwe


Institutional rooftop · 2024
St. Xavier's College
Navrangpura, Ahmedabad · 100 kWp
- Monthly bill
- ₹2,50,000 → ₹1,50,000
- Annual savings
- ₹12,00,000
- Equipment
- Raajratna bifacial, Solaryaan
Prices
Solar Panel Price in Ahmedabad (October 2026)
Full installed prices for a home on-grid system with made-in-India (DCR) panels, an elevated GI structure, wiring, installation and net-meter paperwork. Only DCR systems get the central subsidy.
| System size | Price before subsidy | PM Surya Ghar subsidy | You pay | Units per month |
|---|---|---|---|---|
| 1 kW | ₹55,000–62,000 | ₹30,000 | ₹25,000–32,000 | ~125 |
| 2 kW | ₹1,04,000–1,16,000 | ₹60,000 | ₹44,000–56,000 | ~250 |
| 3 kW | ₹1,50,000–1,71,000 | ₹78,000 | ₹72,000–93,000 | ~375 |
| 5 kW | ₹2,40,000–2,75,000 | ₹78,000 | ₹1,62,000–1,97,000 | ~625 |
| 10 kW | ₹4,60,000–5,30,000 | ₹78,000 | ₹3,82,000–4,52,000 | ~1,250 |
Indicative prices, October 2026. Units assume about 1,500 units per kW per year. Your price depends on roof height, brands and cable length.
Small homes may pay even less. Gujarat has announced an extra state subsidy for systems up to 2.18 kWp commissioned from 22 October 2026, so eligible families pay about 10% of the benchmark cost (5% for SC/ST). The details are in our Gujarat solar subsidy guide. For 4 kW, 7 kW, panel-only prices and a full 3 kW cost breakdown, see the solar panel price list for Gujarat.
Who and where we install
Areas We Serve in Ahmedabad
Homes and bungalows
Rooftop systems for bungalows, row houses and tenements in Bopal, South Bopal, Shela, Gota, Chandkheda, Motera, Satellite, Prahlad Nagar, Thaltej, Vastrapur and Navrangpura. You get up to ₹78,000 subsidy under PM Surya Ghar, and we file the application for you.
Residential solar →Housing societies
Solar on the common terrace to cut the society bill for lifts, water pumps and common lighting. PM Surya Ghar gives housing societies ₹18,000 per kW for common facilities, up to 500 kW at 3 kW per house.
Ask about society solar →Factories in GIDC estates
Rooftop plants on PEB and metal sheet sheds in Vatva, Naroda, Odhav, Kathwada, Changodar, Sanand, Santej and Kerala GIDC (Bavla). Most factories use solar power during working hours, so savings show up from the first bill. Start with our factory solar sizing guide or the factory rooftop solar guide.
Industrial solar →Hospitals, schools and offices
Large daytime loads make these buildings a good fit for rooftop solar. We design the structure around the terrace, water tanks and equipment already on the roof.
Commercial solar →Size and roof space
How Big a Solar System Do You Need?
In Ahmedabad, 1 kW of rooftop solar produces about 1,500 units a year, or roughly 125 units a month, and needs 80 to 100 sq ft of shade-free roof. Use your average monthly units from the electricity bill to find a starting size.
These are starting points. We confirm the final size after the site visit, based on your sanctioned load, roof and usage pattern. For cost and payback on your own bill, use the solar savings calculator.
| Monthly units | System size | Roof space |
|---|---|---|
| Around 250 | 2 kW | 160–200 sq ft |
| Around 375 | 3 kW | 240–300 sq ft |
| Around 625 | 5 kW | 400–500 sq ft |
| Around 1,250 | 10 kW | 800–1,000 sq ft |
| Around 12,500 | 100 kW | 8,000–10,000 sq ft |
Based on about 1,500 units per kW per year. Actual generation depends on shade, tilt, cleaning and weather.
Approvals
Net Metering in Ahmedabad: Torrent Power and UGVCL
Most homes and businesses inside Ahmedabad city are supplied by Torrent Power. Areas outside the city limits, such as Bavla and Sanand, usually come under UGVCL. The paperwork differs a little between the two, and ASV handles both.
With net metering, the units your plant sends to the grid are adjusted against the units you take from it, so you pay only for the difference.
- ApplicationWe file your rooftop solar and net metering application with your DISCOM, and the PM Surya Ghar subsidy application for homes.
- Feasibility approvalThe DISCOM checks your connection and sanctioned load and approves the plant size.
- InstallationOur team installs and tests the plant, usually within days for a home system.
- Inspection and net meterThe DISCOM inspects the plant and installs a bidirectional net meter.
- Commissioning and subsidyThe plant starts generating. For homes, the subsidy is credited to your bank account after commissioning.
From application to subsidy, a typical home takes about 45–75 days, depending on the DISCOM's queue. Surplus units left at the end of the billing cycle are bought at about ₹2.25 per unit. Home tariffs for FY 2026-27 are ₹3.20–5.00 per unit for Torrent Power and ₹3.05–5.20 for UGVCL, plus fuel surcharge, so every solar unit you use yourself is worth more than one you export.
Why ASV
Why Ahmedabad Customers Choose ASV
A team close to you
Our office is in Koba, a short drive from most of Ahmedabad, so site visits and service calls do not wait for a long trip.
Known panel and inverter brands
Our Ahmedabad plants use panels such as Waaree and Raajratna and inverters such as Solis and Goodwe. You choose from the options in your proposal.
Structures built for the roof
RCC terraces, metal sheet sheds and curved roofs each get their own structure design, so the roof stays leak-free and the plant stays wind-safe.
Solar loans available
Prefer EMIs? ASV arranges solar loans through Solfin, Ecofy and Ratnaafin for homes, businesses and industries.
Questions Ahmedabad customers ask
Solar in Ahmedabad: FAQs
How much does rooftop solar cost in Ahmedabad?
A 3 kW home system with DCR panels costs about ₹1.50–1.71 lakh installed, or ₹72,000–93,000 after the ₹78,000 PM Surya Ghar subsidy. A 5 kW system costs about ₹2.40–2.75 lakh before subsidy (indicative, October 2026).
How much subsidy can I get for solar in Ahmedabad?
Homes get ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW under PM Surya Ghar, up to ₹78,000. Gujarat has also announced an extra state subsidy for systems up to 2.18 kWp from 22 October 2026. Factories and shops do not get this subsidy. ASV files the application for you.
How long does Torrent Power net metering take?
For a home, the full process from application to subsidy usually takes about 45–75 days, depending on the DISCOM's inspection queue. Installation itself takes 1–3 days. ASV handles the Torrent Power and UGVCL paperwork.
Is my area under Torrent Power or UGVCL?
Most of Ahmedabad city is supplied by Torrent Power, and much of the surrounding district, including several GIDC estates, is supplied by UGVCL. The DISCOM name is printed on your electricity bill.
How do I choose the best solar company in Ahmedabad?
Check that the company is a registered PM Surya Ghar vendor, uses DCR panels for subsidy systems, quotes the exact kWp and brands, includes earthing and a lightning arrester, gives 5 years of free maintenance in writing, and can show real local projects you can visit.
Can a 3 kW solar system run an AC?
A 3 kW system makes about 375 units a month. A 1.5-ton inverter AC used for 8 hours a day in summer can use roughly 250–350 units a month, so a home with one AC plus normal use often needs 3–5 kW. We size it from your 12-month bill.
Can I pay for solar in EMIs?
Yes. PM Surya Ghar offers collateral-free bank loans of up to ₹2 lakh at about 7% for home systems up to 3 kW. ASV also works with solar finance partners such as Solfin, Ecofy and Ratnaafin, with terms set by the lender.
Do you provide maintenance (AMC) after installation?
Yes. Home systems under PM Surya Ghar include 5 years of free maintenance from the vendor. For factories and commercial plants we offer AMC plans with panel cleaning, checks and performance monitoring.
Do you install solar for factories in Ahmedabad GIDCs?
Yes. We have built plants in Vatva GIDC (100 kWp) and Kerala GIDC, Bavla (250 kWp), and serve Naroda, Odhav, Changodar, Sanand and Santej. Factory systems do not get the subsidy, but higher commercial tariffs mean they often pay back in a few years.
How much roof space do I need?
About 80–100 sq ft of shade-free roof per kW. A 3 kW home system needs roughly 240–300 sq ft, and a 100 kW factory system needs about 8,000–10,000 sq ft.
Contact
Visit or Call Our Office
ASV Energy Solutions
609, Radhe Times Square, near Institute of Hotel Management, Koba, Gandhinagar, Gujarat 382426
Phone and WhatsApp: +91 96626 63069
Email: info@asvenergysolutions.com
Open in Google Maps
Sources
- MNRE, PM Surya Ghar operational guidelines (June 2024): subsidy rates, DCR rule, society subsidy, 5-year maintenance.
- GERC, Torrent Power Ahmedabad tariff schedule and state DISCOM tariff schedule, effective 1 April 2026.
- Energetica India, Gujarat announces additional state subsidy for rooftop solar up to 2.18 kWp (October 2026).
- ASV Energy Solutions, solar panel price in Gujarat (October 2026): price ranges and their sources.
About the author
Vishal Modi, Managing Partner, ASV Energy Solutions
Vishal leads ASV Energy Solutions, a solar EPC company based in Gandhinagar. The team has completed 5,500+ solar installations and 90 MW+ of capacity across homes, factories and ground-mount plants in Gujarat, Maharashtra and Madhya Pradesh.
Last updated: 28 October 2026