Solar EPC for Surat homes, societies and industry
Rooftop and Industrial Solar in Surat, Installed by ASV
Quick answer: ASV Energy Solutions installs rooftop solar for homes, societies and factories across Surat, from Adajan, Vesu and Pal to Sachin, Pandesara and Palsana. A 3 kW home system costs about ₹1.50–1.71 lakh, or ₹72,000–93,000 after the PM Surya Ghar subsidy (indicative, November 2026). We handle DGVCL and Torrent Power net metering.
ASV Energy Solutions is a solar EPC company based in Koba, Gandhinagar, with 5,500+ installations and 90 MW+ of capacity built across Gujarat, Maharashtra and Madhya Pradesh. We take on home, society and industrial projects across Surat and south Gujarat.
Surat has two DISCOMs. Parts of Surat city are supplied by Torrent Power; the rest of the city's outskirts and Surat district are supplied by DGVCL (Dakshin Gujarat Vij Company). The name on your electricity bill tells you which one is yours, and we handle net metering with both.
- DGVCL and Torrent PowerNet metering paperwork handled for both
- Up to ₹78,000PM Surya Ghar subsidy, plus the state top-up up to 2.18 kW
- Sachin, Pandesara, PalsanaFactory rooftops for textile and engineering units
Our work across Gujarat
Solar Plants We Have Built
Real plants and real bills from our projects in Gujarat. See all of them, including our 6 MW ground-mount plant in Kutch, on the projects page.

Industrial rooftop · 2024
Vijay & Kishor Engineering
Vatva GIDC, Ahmedabad · 100 kWp
- Monthly bill
- ₹1,20,000 → ₹30,000
- Annual savings
- ₹12,00,000
- Equipment
- Waaree bifacial, Solis

Industrial rooftop · 2024
Partabi Industries
Kerala GIDC, Bavla · 250 kWp
- Units per year
- 3,65,000 kWh
- Annual savings
- ₹30,00,000
- Equipment
- Raajratna, Solaryaan

Hospital rooftop · 2025
VIMS Hospital
Motera, Ahmedabad · 100 kWp
- Monthly bill
- ₹5,00,000 → ₹4,00,000
- Annual savings
- ₹12,00,000
- Equipment
- Waaree bifacial, Goodwe

Institutional rooftop · 2024
St. Xavier's College
Navrangpura, Ahmedabad · 100 kWp
- Monthly bill
- ₹2,50,000 → ₹1,50,000
- Annual savings
- ₹12,00,000
- Equipment
- Raajratna bifacial, Solaryaan
Prices
Solar Panel Price in Surat (November 2026)
Surat homes pay the same Gujarat prices and get the same subsidies as the rest of the state. What changes is your roof, structure height and the brands you choose.
| System size | Price before subsidy | Subsidy | You pay | Units per month |
|---|---|---|---|---|
| 1 kW | ₹55,000–62,000 | ₹30,000 + state top-up | ≈ ₹5,000 with state top-up* | ~120 |
| 2.18 kW | ₹1,13,000–1,26,000 | ₹63,240 + state top-up | ≈ ₹10,810 with state top-up* | ~260 |
| 3 kW | ₹1,50,000–1,71,000 | ₹78,000 | ₹72,000–93,000 | ~360 |
| 5 kW | ₹2,40,000–2,75,000 | ₹78,000 | ₹1,62,000–1,97,000 | ~600 |
| 10 kW | ₹4,60,000–5,30,000 | ₹78,000 | ₹3,82,000–4,52,000 | ~1,200 |
Indicative prices, November 2026, for on-grid systems with DCR panels, elevated structure, installation and net meter paperwork. *Gujarat's state top-up applies to home systems up to 2.18 kWp commissioned from 22 October 2026: you pay 10% of the benchmark (5% for SC/ST). Size guides: 2 kW with state subsidy, 3 kW price, 5 kW price. Full list: solar panel price in Gujarat.
Where we work
Areas We Serve in Surat
We work across Surat city, its industrial estates and south Gujarat.
Homes and bungalows
Adajan, Vesu, Pal, Piplod, Althan, Citylight, Varachha, Katargam and Dumas Road.
Residential solarHousing societies and apartments
Common-area solar for lifts, pumps and lighting. Under PM Surya Ghar, group housing societies get ₹18,000 a kW for common facilities.
Society subsidy rulesTextile and industrial units
Sachin, Pandesara and Ichchhapore GIDC, the Kadodara–Palsana textile belt and the Hazira area.
Industrial solarDiamond units, offices and schools
Daytime loads in Varachha, Katargam and the city's commercial areas that match solar output well.
Ask for a site visitFor factories
Factory Solar for Surat's Textile and Industrial Units
Surat's weaving, processing and embroidery units often run round the clock. For a 24-hour load, every unit a rooftop plant makes in the day is used on site, so solar cuts the bill without exports going to waste. It won't cover the night load, so expect solar to supply part of your units, not all of them.
Under GERC's 2026 net metering rules, a factory can set off exported units only up to 30% of the units it imports in each billing cycle, so a round-the-clock unit rarely hits that limit. We also check shed roof strength, sheet condition and fire-safety access around stored yarn and fabric before we design.
| Plant size | Indicative cost (GST incl.) | Units a year | Typical fit |
|---|---|---|---|
| 50 kW | ₹21–25 lakh | ~75,000 | One-shift unit, 6,000–9,000 units a month in daytime |
| 100 kW | ₹40–48 lakh | ~1.5 lakh | Small HT or large LT unit |
| 500 kW | ₹1.9–2.3 crore | ~7.5 lakh | Two-shift plant with a big shed roof |
| 1 MW | ₹3.5–4.2 crore | ~15 lakh | Large HT consumer; check the 30% set-off cap |
Indicative, November 2026. Guides: 50 kW plant cost, 100 kW plant cost, 1 MW plant cost, sizing from your bill, battery storage for factories.
Approvals
Net Metering in Surat: DGVCL and Torrent Power
Both DGVCL and Torrent Power follow the same GERC rules. Homes get full set-off of exported units against imports, with surplus bought at ₹2.25 a unit. Factories and shops can set off exports up to 30% of their imports, with banking charges.
What differs is the tariff and who inspects. Torrent Power has its own tariff and peak hours, and inspects and fits the net meter itself; on DGVCL it's your local sub-division. Home subsidy applications for both go through the PM Surya Ghar portal.
- Site visit and sizingWe check your roof, last 12 bills and sanctioned load, and size the plant to what you use.
- ApplicationHomes apply on the PM Surya Ghar portal; factories and shops go through GEDA, the CEI and DGVCL or Torrent Power. We file it all.
- InstallationOne to three days for a home; two to six weeks for a factory plant, depending on size.
- Inspection and net meterDGVCL or Torrent Power inspects the plant and fits the net meter. A complete file is the best way to avoid delays.
- Subsidy and monitoringFor homes, the subsidy reaches your bank account after commissioning. We set up monitoring and service visits.
Full rules: net metering in Gujarat under the GERC 2026 regulations and our Gujarat solar subsidy guide.
Why ASV
Why Surat Customers Choose ASV
Full EPC under one roof
Design, supply, installation, approvals and service by our own team, not a chain of sub-contractors.
Industrial experience
From 100 kWp factory rooftops to multi-MW ground-mount plants, so large shed roofs are engineered properly.
Honest sizing
We size to your daytime use and the new GERC rules, and we'll tell you when a smaller plant pays better.
Both DISCOMs handled
PM Surya Ghar, GEDA, CEI, DGVCL and Torrent Power paperwork filed and followed up by us.
Questions Surat customers ask
Solar in Surat: FAQs
How much does a 3 kW solar system cost in Surat?
About ₹1.50–1.71 lakh installed with DCR panels, or ₹72,000–93,000 after the ₹78,000 PM Surya Ghar subsidy (indicative, November 2026).
Is my Surat connection on DGVCL or Torrent Power?
Check the name printed on your electricity bill. Parts of Surat city are on Torrent Power; the outskirts and Surat district are on DGVCL.
Is the Gujarat state solar subsidy available in Surat?
Yes, for both DGVCL and Torrent Power consumers, on home systems up to 2.18 kWp commissioned from 22 October 2026. You pay 10% of the benchmark cost (5% for SC/ST), about ₹10,810 for 2.18 kW.
Does solar make sense for a 24-hour textile unit?
Yes. A round-the-clock unit uses all of its daytime solar on site, so no output is wasted under the 30% set-off cap. Solar covers the daytime share of your units, not the night load.
Do you install solar in Sachin, Pandesara or Palsana?
Yes. We design and build industrial rooftop plants for units across Surat's GIDC estates and textile belt, with approvals handled by us.
Can a housing society in Surat get a solar subsidy?
Yes. Under PM Surya Ghar, group housing societies get ₹18,000 a kW for common facilities, and individual flats can claim the home subsidy on their own connections.
How long does solar installation take in Surat?
A home system takes one to three days on site. The DGVCL or Torrent Power inspection and net meter usually follow within a few weeks.
Do you visit Surat for site surveys?
Yes. Send us your bill and roof photos on WhatsApp first; we confirm feasibility and then schedule a site visit.
Contact
Get a Solar Quote in Surat
ASV Energy Solutions
609, Radhe Times Square, near Institute of Hotel Management, Koba, Gandhinagar 382426
Phone and WhatsApp: +91 96626 63069
Email: info@asvenergysolutions.com
We're based in Koba, Gandhinagar, and work across Surat and south Gujarat. Send your last electricity bill and a roof photo on WhatsApp for a quick estimate.
- Gujarat state top-up up to 2.18 kWp (Energetica India, Oct 2026)
- GERC DRES Regulations 2026 (SolarQuarter, 2 Nov 2026)
- PM Surya Ghar portal
About the author
Vishal Modi, Managing Partner, ASV Energy Solutions
Vishal leads ASV Energy Solutions, a solar EPC company based in Gandhinagar. The team has completed 5,500+ solar installations and 90 MW+ of capacity across homes, factories and ground-mount plants in Gujarat, Maharashtra and Madhya Pradesh, and handles PM Surya Ghar and net metering approvals with every Gujarat DISCOM.
Last updated: 8 November 2026